翻訳と辞書 |
1878 in architecture : ウィキペディア英語版 | 1878 in architecture
The year 1878 in architecture involved some significant events. ==Buildings==
* Work begins on the Herrenchiemsee in Bavaria, designed by Georg Dollman. * The Semperoper in Dresden, designed by Gottfried Semper, is completed. * The Tower House, Kensington, designed by William Burges for himself, is completed. * The White House and No. 1 Tite Street, Chelsea, London, designed by Edward William Godwin, are completed. * The Michigan State Capitol in Lansing, Michigan is completed. * Construction begins on the Indiana Statehouse Indianapolis, Indiana
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「1878 in architecture」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|